İzlemek

Döner Yüzey TaşlamaBLANCHARD 22AD-42

Michigan, Birleşik Devletler

genel bakış

model
kimlik numarası
544354
Durum
Kullanılmış - Rebuilt
Yıl
2022
Yer
Michigan
Birleşik Devletler
Stok #
Template
Tanım
Blanchard #22AD-42, 42" Vertical Spindle Rotary Surface Grinder with A/B PLC, Servo Drive, Re-manufactured w/ Warranty
Spec
Özellikleri İmparatorluğa Dönüştür
Yatak Büyüklüğü1,066.8 mm
Yty/DkyVert
Güç37.3 kW
Salınım1,219.2 mm
Teker Altı609.6 mm
Delme Çark Çapı558.8 mm

spec Sheet

Chuck Dia.: No Specs Attached inches Spindle (Horz/Vert): No Specs Attached Power: No Specs Attached horsepower Swing: No Specs Attached inches Under Wheel: No Specs Attached inches Table Speeds: No Specs Attached Grinding Wheel Width: No Specs Attached inches Table Motor Horsepower: No Specs Attached horsepower Grinding Wheel Dia.: No Specs Attached inches CNC Control: No Specs Attached Type of CNC Control: No Specs Attached Dimensions: No Specs Attached Weight: No Specs Attached ounces 22" Grinding Wheel Diameter42" Magnetic Chuck Diameter44" Swing Inside Water Guards24" Vertical Range,Standard3000 LBS. Maximum Load on Chuck50 HP Grinding Wheel Horsepower480 Volt /60 Hertz Main MotorMachine Dimensions: 12'L-R x 57"D x 103-1/2"HElectrical Cabinet: 73"L-R x 40"D x 91"H ApproximateApprox. Weight: 16,000 lbs.Re-manufactured Blanchard Model 22AD-42 All Electric Allen Bradley PLC Controlled, Vertical Spindle Rotary Table Surface Grinder   Thank you for choosing F. P. Miller Company to provide you with a quote on a re-manufactured #22AD-42 Automatic Blanchard Rotary Surface Grinder. The work will consist of a mechanical rebuild and Allen Bradley PLC, drives and programming which includes specific items as follows:1) MACHINE DIS-ASSEMBLY:a) Completely disassemble machine & inspect parts and castings.b) Clean and wire brush all parts2) TABLE AND TABLE SUPPORT WAYS:a) Machine as required.b) Precision Scrape, fit the table support ways to the table ways.c) Installation of Moglice wear material in cup if needed.d) Grind magnetic chuck hardened bull gear 3) CARRIAGE AND BASE WAYS:a) Re-grind hardened base ways (Replace if needed)b) Precision scrape and fit carriage to base ways.c) Installation of cast iron wear strip if needed4) VERTICAL SLIDE AND COLUMN WAYS:a) Machine as requiredb) Precision scrape and fit the vertical slide ways to the column ways including the gibs.c) Replace or rebuild Elevating Screw and Nutd) Installation of cast iron insert material if needed.5) CARRIAGE AND TABLE DRIVE MECHANISMSa) Inspect and rebuild carriage drive assembly (including replacing bearings and seals).b) Replace Rack and Pinionc) Inspect and rebuild table drive assembly (including replacing bearings and seals).6) HEAD FEED MECHANISM:a) Inspect and rebuild head feed as required (including replacing bearings and seals).b) Inspect Feed worm gear and pinion, remove backlash.7) SPINDLE UNIT COMPLETE:a) Disassemble the spindle unit, clean and evaluate.b) Check spindle taper fit to wheel collar taper, and repair if required.c) Replace the upper and lower spindle bearingsd) Meg, clean and re-bake main motor windinge) Reassemble the spindle unit, and test.8)ELECTRICAL FEED MOTORS:a)Disassemble feed motors, clean and evaluate.b)Replace bearings9)GREASE SYSTEM:a)Install new automatic grease systemb)Replace all lube lines on the column ways.c)Replace  all lube blocks and clean oil ports on the column waysd)Remove all lube lines on the carriage, base and table.e)Replace all lube blocks and clean oil ports on the carriage, base and table.f)Re-pipe with all new lines and fittings, the carriage, base and table.10)ELECTRICAL:a)All new wiring on machineb)New electrical panelc)All new limit switches and push button switches (placed to your configuration)d) New Allen Bradley PLC Control System and componentse)Install soft start for tablef)Updated Schematicsg)Updated manuals11)MAGNETIC CHUCK: a)Install New Magnetic Chuck Controls12)GUARDING AND COOLANT LINES:a)Replace all water guards b)Fit to machinec)Install new coolant Lines and External Clean Out Hosed)Include operators window e)Install Marpos gauge readout "Swinging shelf" (if needed)13)PAINT:a)Sand entire machine to original machine surface.b)Clean.c)Prime and paint grey. "Will accommodate customers paint specs if possible"14)REASSEMBLY OF MACHINE COMPLETE AND TEST:REQUIREMENTS:1. CONTRACTORS RESPONSIBILITY:F. P. Miller will be responsible for furnishing all services, labor, parts and materials necessary to rebuild the machine as described above.2. DISASSEMBLY AND INSPECTION:-All areas and items of rebuild will be completely dismantled to basic parts and castings.-All parts and castings will be thoroughly inspected for defects.3. RE-UTILIZATION OF PARTS:-All parts that will be reused will be in such condition to assure proper part function and fit. This applies to parts which are used as is, as well as those that are repaired, or replaced.4. REPLACEMENT PARTS:-Replacement parts will be OEM or a suitable substitute.5. BEARINGS:-All bearings associated with spindle, regardless of condition, will be replaced with new bearings of the same type and precision class or better.6. SEALS AND GASKETS:-All seals and gaskets will be replaced with new seals and gaskets of a type equal to or better than original quality.7. FASTENING DEVICES:-All fastening devices will be inspected and all defective devices will be replaced.8. ACCEPTANCE TEST:-The machine will be run off at F. P. Miller Company with testing witnessed by customer.9. DOCUMENTATION:-Two complete sets of machine documentation covering-Electrical diagrams, maintenance and operating procedures, will be provided to customer10. TRANSPORTATION:-It is the customers responsibility for transportation from F. P. Miller Company, we can assist with arrangements upon request.-F. P. Miller will need Advanced Notice of Shipping Arrangements, prior to picking up machine, for proper time to package and prep machine11. DELIVERY:-Delivery of the machine will be approximately 22-24 weeks from the receipt P.O. and Down Payment and is dependent on availability of replacement parts and current shop schedule. The delivery will be held unless the lead-time of purchased items causes a delay.12. WARRANTY:F. P. Miller Company warrants the rebuild of this machine against defective materials and workmanship. The warranty terminates (12) months or 2000 operating hours, whichever occurs first, from delivery (some regional restrictions do apply). This applies only if the machine has been installed correctly and used in normal and proper manner under recommended operating conditions. AVAILABLE OPTIONS:External Coolant TankMagnetic ResurfaceMagnet RewindMain Spindle RewindNotes:a)Machine ships with new leveling padsTERMS: 30% with purchase order; 60% after acceptance run-off at F. P. Miller Company viewed by customer; 10% Net 30 Days after delivery of the machine to the customer upon approved credit.
Satıcı hakkında

Bu model hakkında daha fazla

Hakkında daha fazla bilgi görüntülemek için BLANCHARD 22AD-42 marka bilgi, fotoğraflar, videolar ve daha fazlasını içeren, buraya Tıkla .

Bu modelin daha fazla giriş gör

BLANCHARD 22AD-42

Döner Yüzey Taşlama

Kullanılmış - Mükemmel | 1976 | Michigan, Birleşik Devletler
thumb

BLANCHARD 22AD-42

Döner Yüzey Taşlama

1995 | New Jersey, Birleşik Devletler
thumb

BLANCHARD 22AD-42

Döner Yüzey Taşlama

Florida, Birleşik Devletler
₹13,466,632.85 INR

Bu Tip fazla listeleri gör

thumb

BLANCHARD 11-16

Döner Yüzey Taşlama

Michigan, Birleşik Devletler
thumb

BLANCHARD 11-20

Döner Yüzey Taşlama

Michigan, Birleşik Devletler
thumb

BLANCHARD

Döner Yüzey Taşlama

Michigan, Birleşik Devletler
thumb

BLANCHARD 18-42

Döner Yüzey Taşlama

1963 | Michigan, Birleşik Devletler
Hepsini gör

Bu Brand daha bakın listeleri

thumb

BLANCHARD 11-16

Döner Yüzey Taşlama

Michigan, Birleşik Devletler
thumb

BLANCHARD 11-20

Döner Yüzey Taşlama

Michigan, Birleşik Devletler
thumb

BLANCHARD

Döner Yüzey Taşlama

Michigan, Birleşik Devletler
thumb

BLANCHARD 18-42

Döner Yüzey Taşlama

1963 | Michigan, Birleşik Devletler
Hepsini gör