Döner Yüzey TaşlamaBLANCHARD 22AD-42
Michigan, Birleşik Devletlergenel bakış
Marka
model
kimlik numarası
544354
Durum
Kullanılmış - Rebuilt
Yıl
2022
Yer
Michigan
Birleşik Devletler
Birleşik Devletler
Stok #
Template
Blanchard #22AD-42, 42" Vertical Spindle Rotary Surface Grinder with A/B PLC, Servo Drive, Re-manufactured w/ Warranty
Özellikleri İmparatorluğa Dönüştür
Yatak Büyüklüğü | 1,066.8 mm |
Yty/Dky | Vert |
Güç | 37.3 kW |
Salınım | 1,219.2 mm |
Teker Altı | 609.6 mm |
Delme Çark Çapı | 558.8 mm |
spec Sheet
Chuck Dia.: No Specs Attached inches
Spindle (Horz/Vert): No Specs Attached
Power: No Specs Attached horsepower
Swing: No Specs Attached inches
Under Wheel: No Specs Attached inches
Table Speeds: No Specs Attached
Grinding Wheel Width: No Specs Attached inches
Table Motor Horsepower: No Specs Attached horsepower
Grinding Wheel Dia.: No Specs Attached inches
CNC Control: No Specs Attached
Type of CNC Control: No Specs Attached
Dimensions: No Specs Attached
Weight: No Specs Attached ounces
22" Grinding Wheel Diameter42" Magnetic Chuck Diameter44" Swing Inside Water Guards24" Vertical Range,Standard3000 LBS. Maximum Load on Chuck50 HP Grinding Wheel Horsepower480 Volt /60 Hertz Main MotorMachine Dimensions: 12'L-R x 57"D x 103-1/2"HElectrical Cabinet: 73"L-R x 40"D x 91"H ApproximateApprox. Weight: 16,000 lbs.Re-manufactured Blanchard Model 22AD-42 All Electric Allen Bradley PLC Controlled, Vertical Spindle Rotary Table Surface Grinder Thank you for choosing F. P. Miller Company to provide you with a quote on a re-manufactured #22AD-42 Automatic Blanchard Rotary Surface Grinder. The work will consist of a mechanical rebuild and Allen Bradley PLC, drives and programming which includes specific items as follows:1) MACHINE DIS-ASSEMBLY:a) Completely disassemble machine & inspect parts and castings.b) Clean and wire brush all parts2) TABLE AND TABLE SUPPORT WAYS:a) Machine as required.b) Precision Scrape, fit the table support ways to the table ways.c) Installation of Moglice wear material in cup if needed.d) Grind magnetic chuck hardened bull gear 3) CARRIAGE AND BASE WAYS:a) Re-grind hardened base ways (Replace if needed)b) Precision scrape and fit carriage to base ways.c) Installation of cast iron wear strip if needed4) VERTICAL SLIDE AND COLUMN WAYS:a) Machine as requiredb) Precision scrape and fit the vertical slide ways to the column ways including the gibs.c) Replace or rebuild Elevating Screw and Nutd) Installation of cast iron insert material if needed.5) CARRIAGE AND TABLE DRIVE MECHANISMSa) Inspect and rebuild carriage drive assembly (including replacing bearings and seals).b) Replace Rack and Pinionc) Inspect and rebuild table drive assembly (including replacing bearings and seals).6) HEAD FEED MECHANISM:a) Inspect and rebuild head feed as required (including replacing bearings and seals).b) Inspect Feed worm gear and pinion, remove backlash.7) SPINDLE UNIT COMPLETE:a) Disassemble the spindle unit, clean and evaluate.b) Check spindle taper fit to wheel collar taper, and repair if required.c) Replace the upper and lower spindle bearingsd) Meg, clean and re-bake main motor windinge) Reassemble the spindle unit, and test.8)ELECTRICAL FEED MOTORS:a)Disassemble feed motors, clean and evaluate.b)Replace bearings9)GREASE SYSTEM:a)Install new automatic grease systemb)Replace all lube lines on the column ways.c)Replace all lube blocks and clean oil ports on the column waysd)Remove all lube lines on the carriage, base and table.e)Replace all lube blocks and clean oil ports on the carriage, base and table.f)Re-pipe with all new lines and fittings, the carriage, base and table.10)ELECTRICAL:a)All new wiring on machineb)New electrical panelc)All new limit switches and push button switches (placed to your configuration)d) New Allen Bradley PLC Control System and componentse)Install soft start for tablef)Updated Schematicsg)Updated manuals11)MAGNETIC CHUCK: a)Install New Magnetic Chuck Controls12)GUARDING AND COOLANT LINES:a)Replace all water guards b)Fit to machinec)Install new coolant Lines and External Clean Out Hosed)Include operators window e)Install Marpos gauge readout "Swinging shelf" (if needed)13)PAINT:a)Sand entire machine to original machine surface.b)Clean.c)Prime and paint grey. "Will accommodate customers paint specs if possible"14)REASSEMBLY OF MACHINE COMPLETE AND TEST:REQUIREMENTS:1. CONTRACTORS RESPONSIBILITY:F. P. Miller will be responsible for furnishing all services, labor, parts and materials necessary to rebuild the machine as described above.2. DISASSEMBLY AND INSPECTION:-All areas and items of rebuild will be completely dismantled to basic parts and castings.-All parts and castings will be thoroughly inspected for defects.3. RE-UTILIZATION OF PARTS:-All parts that will be reused will be in such condition to assure proper part function and fit. This applies to parts which are used as is, as well as those that are repaired, or replaced.4. REPLACEMENT PARTS:-Replacement parts will be OEM or a suitable substitute.5. BEARINGS:-All bearings associated with spindle, regardless of condition, will be replaced with new bearings of the same type and precision class or better.6. SEALS AND GASKETS:-All seals and gaskets will be replaced with new seals and gaskets of a type equal to or better than original quality.7. FASTENING DEVICES:-All fastening devices will be inspected and all defective devices will be replaced.8. ACCEPTANCE TEST:-The machine will be run off at F. P. Miller Company with testing witnessed by customer.9. DOCUMENTATION:-Two complete sets of machine documentation covering-Electrical diagrams, maintenance and operating procedures, will be provided to customer10. TRANSPORTATION:-It is the customers responsibility for transportation from F. P. Miller Company, we can assist with arrangements upon request.-F. P. Miller will need Advanced Notice of Shipping Arrangements, prior to picking up machine, for proper time to package and prep machine11. DELIVERY:-Delivery of the machine will be approximately 22-24 weeks from the receipt P.O. and Down Payment and is dependent on availability of replacement parts and current shop schedule. The delivery will be held unless the lead-time of purchased items causes a delay.12. WARRANTY:F. P. Miller Company warrants the rebuild of this machine against defective materials and workmanship. The warranty terminates (12) months or 2000 operating hours, whichever occurs first, from delivery (some regional restrictions do apply). This applies only if the machine has been installed correctly and used in normal and proper manner under recommended operating conditions. AVAILABLE OPTIONS:External Coolant TankMagnetic ResurfaceMagnet RewindMain Spindle RewindNotes:a)Machine ships with new leveling padsTERMS: 30% with purchase order; 60% after acceptance run-off at F. P. Miller Company viewed by customer; 10% Net 30 Days after delivery of the machine to the customer upon approved credit.
Bu modelin daha fazla giriş gör
Bu Tip fazla listeleri gör
BLANCHARD 11-16
Döner Yüzey Taşlama
BLANCHARD 11-20
Döner Yüzey Taşlama
BLANCHARD
Döner Yüzey Taşlama
BLANCHARD 18-42
Döner Yüzey Taşlama
Bu Brand daha bakın listeleri
BLANCHARD 11-16
Döner Yüzey Taşlama
BLANCHARD 11-20
Döner Yüzey Taşlama
BLANCHARD
Döner Yüzey Taşlama
BLANCHARD 18-42
Döner Yüzey Taşlama